Four forces operating in the market today could result in data center space requirements that will shrink dramatically before the decade is out, according to Gartner. The primary factors impacting data centers in a significant way during the next five years include: smarter designs, energy efficiency pressures (or green IT), the realities of high-density environments, and the potential of cloud computing.

“In the world of IT, everything has cascade effects, and in data centers the traditional methods of design no longer work without understanding the outside forces that will have an impact on data center costs, size and longevity,” said David Cappuccio, managing vice president and chief of research for infrastructure at Gartner. “However, these very forces can actually work in your favor, providing the means to apply innovative designs, reduce capital costs and operating costs, increase long term scale, and keep up with the business.”

Gartner recommends that data center managers who are trying to determine how to optimally design and plan for the leading-edge data center of the future focus on the following four factors:

Smarter Designs
Traditional methods of designing data centers were created during the mainframe era, and, because of their high costs, many mainframes were targeted for average performance in the mid-90 percent range during production time slots. As a result, there was minimal variation in the operating temperature or power consumption during long periods of time.

Today’s data centers have many different demands on mechanical/electrical systems, depending on workload mix, function and age of equipment. New designs have taken this into account by adding different density zones for different workload types. This zone might employ directed cold air, or even in-rack cooling to support very high density workloads with minimal disruption, or impact, on the rest of the floor. Secondary zones would support steady-state applications that consume a consistent amount of power and produce manageable heat loads, while low-density zones would be designed to support low-power equipment (perhaps telecom and storage).

Green Pressures
Most data center managers paid little attention to the “greening of IT,” unless they were pressured into it by senior management or the public. However, as awareness has increased, there has been a constant uptick in the attention paid to energy consumption in data centers, and new data center managers take a hard look at energy efficiency in both design and execution. The development and marketing of power utilization efficiency (PUE) by the Green Grid continues to gain ground in the market, and many new data centers are being developed with specific PUE targets in mind, for the energy-efficiency advantages and the public relations impact.

Conquering Density
With smarter designs and green pressures, data center managers and designers have begun to focus on the compute density in their environments. Most data centers are woefully underutilized from a space perspective. The physical floor space may be nearing capacity, but in many cases, the actual compute space within racks and servers is very poorly used, with average rack densities approaching just 60 percent worldwide.

Newer designs focus on this issue and are developed to allow optimal rack density, often approaching 85 to 90 percent, on average, thus increasing the compute-per-square-foot ratio dramatically. The advent of private cloud environments and resource pooling will provide methods to enhance vertical scalability in the data center, while at the same time improving the productivity-per-kilowatt ratio.

Cloud Computing
Data center managers are beginning to consider the possibility of shifting nonessential workloads to a cloud provider, freeing up much-needed floor space, power and cooling, which can then be focused on more-critical production workloads, and extending the useful life of the data center. Shifting workloads is not new; many companies use collocation facilities as an overflow mechanism. However, the difference is that, with collocation, the compute resource is still owned and managed by the application owner. With offloading services to the cloud, ownership and management of IT assets is shifted to the provider, essentially outsourcing the service to someone else.

As this practice increases in popularity, the landscape for what remains of the corporate data center will change significantly. Only core business functions — those that differentiate a business from its competition, or are truly mission-critical — will remain in the primary data center. All other noncritical services will eventually migrate to external providers, having the long-term effect of shrinking physical data center requirements. Gartner predicts that by 2018, data center space requirements will be only 40 percent of what they are today. The focus of these data centers will be on core business services, and, as those services continue to demand more IT resources, the shrinking size of servers and storage (and telecom equipment) will more than offset that growth.

Previous ArticleNext Article

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

GET TAHAWULTECH.COM IN YOUR INBOX

The free newsletter covering the top industry headlines